山谷中心传输 
线路项目TL 6926

我们承诺提供清洁, safe and reliable energy means making enhancements to our system, which includes transmission line upgrade activities that will help improve the reliability and integrity of our electric system.

山谷中心地下

概述

Strategic undergrounding of overhead power lines is one element of a multi-pronged approach to reducing wildfire risk. Most of the existing overhead transmission line (TL6926), in the Valley Center community in northern San Diego County, 将被埋在地下. The remainder of the transmission line’s wood poles will be replaced with fire-resistant steel poles.  

As part of our 社区 Fire 安全 Program, this project includes safety and reliability measures that help increase the resiliency of our electric system during extreme weather conditions in high fire-risk areas. Other steps we’re taking to improve reliability include increased inspections of our electric system and additional tree trimming.

项目的好处

  • Enhanced reliability of the electric grid
  • Increased resiliency of the electric system
  • Improved electric system safety and performance during extreme weather conditions

项目进度表及地图

预计开始日期- 4日 2020年一季度     预计结束日期- 4日 2022年一季度

La Jolla Undergrounding Project Map

项目简介

This project will take around two years to complete. Seven miles of an overhead transmission power line, along Valley Center Road between two existing substations, will be removed – while leaving intact the existing distribution power line on shorter poles. The new transmission power line will be placed underground along Valley Center Road, Cole Grade Road and Pauma Heights Road. The last three-mile section of the power line will transition above ground, 沿着波马高地路, where steel poles already support the power line. This double circuit alignment will connect to 西班牙&E’s substation on Valley Center Road.

975.34 KB
PDF
Valley Center Transmission Line Project - Fact Sheet
Valley Center Transmission Line Project - Fact Sheet

期待什么

西班牙&E’s team will work as safely and quickly as possible and make every effort to minimize disruptions such as construction traffic, dust and noise along these streets. Although not anticipated, our work may require us to shut off the power for safety purposes. If so, we’ll contact you in advance to ensure you’re prepared for a planned outage. Construction dates are subject to change according to compliance requirements, inclement weather or other unforeseen circumstances. Construction activities often occur intermittently and will not occur concurrently.

项目更新及报告

124.46 KB
PDF
2021年8月9日更新
2021年8月9日更新
14.13 KB
多克斯
2021年8月13日更新
2021年8月13日更新
16.82 KB
多克斯
2021年8月19日更新
2021年8月19日更新

你知道吗??

西班牙&E® has invested about $2 billion in a variety of initiatives and technologies over the past decade to help prevent catastrophic wildfires. 这些倡议包括: 

  • Significant investments to replace wood poles with fire-resistant steel poles 
  •  Building a sophisticated weather monitoring network including enhanced fire and weather forecasting models and updating operating protocols 
  • Building partnerships to enhance the region’s overall ability to respond to wildfires, 不管是什么原因  

更多的信息

If you have questions or concerns, please call the Project Information line at (844) 765-6388.